Market Insights  /  Fairmount & Art Museum
Development Watch · Fairmount & Art Museum

1600 W Girard AveUnder construction

202-unit residential new construction, zoned CMX3.

DeveloperMMPartners, LLCArchitectCosciaMoos ArchitectureStatusBuilt
Rendering of 1600 W Girard Ave — 1600 West Girard Avenue - CosciaMoos Architecture
1600 West Girard Avenue - CosciaMoos Architecture
Rendering of 1600 W Girard Ave — 1600 West Girard Avenue - CosciaMoos Portfolio
1600 West Girard Avenue - CosciaMoos Portfolio
Published renderings · via archinect.com. Shown for informational purposes; rights belong to the original creator.See the source →

A seven-story, 209-unit residential building is under construction at 1600 W Girard Avenue, anchoring the northwest corner of Fairmount's CMX3 corridor where Girard meets the diagonal of Ridge Avenue. The project, cleared to build in late 2021, uses a hybrid construction approach—Type IA for the podium's first three floors, Type IIIA for the upper residential levels—over a nearly acre-sized lot. Ground-floor commercial space remains vacant shell, requiring separate fit-out work before any retail or restaurant can occupy. A recent amendment in late 2024 bumped the unit count from 202 to 209 while trimming back parking, a move that suggests the developer is betting on walkability and transit access over car storage in a neighborhood already well-served by the Spring Garden trolley and the Art Museum corridor.

The site, owned by 1600 W Girard Ave Ground Owner LLC since 2021, sits in a CMX3 zone that permits this kind of mid-rise development by right, and the project's scale reflects exactly what that zoning was designed to produce. The 41,700-square-foot parcel is one of the larger assemblages in the immediate area, offering room for amenities and parking that smaller infill sites can't accommodate. The horizontal fire separation strategy—essentially treating the podium and tower as two discrete buildings for code purposes—is the kind of technical maneuver that lets developers push density without triggering full high-rise construction standards.

This project is the heavyweight in a cluster of smaller efforts reshaping the Girard Avenue corridor between Broad Street and the Schuylkill. Nearly 300 new units have either delivered or are in the pipeline within a half-mile radius, including a 49-unit building at 918 N Broad and a handful of 11- to 17-unit low-rises along Ridge Avenue. Most of those are opportunistic infill; this one is a genuine neighborhood anchor, the kind of project that can nudge landlords and owners of adjacent underperforming parcels to reassess their hold strategies.

The real test will be whether the ground-floor commercial finds takers once the building delivers. Fairmount has proven it can absorb new apartments, but activating street-level retail in a corridor still finding its rhythm is harder. If 1600 W Girard succeeds, expect more assemblages and mid-rise proposals on the surrounding blocks—especially along Girard's south side, where low-slung commercial strips and surface lots still dominate.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~7-story by-right envelope, not the developer's design.
Units
202
Zoning
CMX3
By-right envelope
~7 stories
Lot
41,703 sq ft
Last sale
$12M · 2021
Cleared to build
Sep 2, 2021
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 71 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~86buildable units
████████ Street
CMX4 · 0.32 mi away
Max bid to a builder $5.9M · Opportunity Score 100
Unlock →
~75buildable units
████████ Street
CMX4 · 0.29 mi away
Max bid to a builder $5.1M · Opportunity Score 100
Unlock →
~303buildable units
████████ Street
CMX4 · 0.39 mi away
Max bid to a builder $14M · Opportunity Score 99
Unlock →
~97buildable units
████████ Street
CMX2.5 · 0.28 mi away
Max bid to a builder $4.6M · Opportunity Score 98
Unlock →
~61buildable units
████████ Street
CMX3 · 0.16 mi away
Max bid to a builder $2.8M · Opportunity Score 98
Unlock →
Unlock the 71 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

17u1633-43 Ridge Ave0.10 mi
13u1435 W Girard Ave0.13 mi
12u1638 Ridge Ave0.13 mi
11u1630-32 Ridge Ave0.14 mi
49u918 N Broad St0.18 mi
12u1822 Ridge Ave0.18 mi
70u915-23 N Broad St0.23 mi
19u1412 N 17th St0.28 mi
In the news

What we're hearing about this project

City Planning Commission reviewed the proposal for a 7-story building with 192 residential units on floors 2-7, totaling 147,588 square feet.
The 7-story, 192-unit mixed-use development was built on a vacant hospital parking lot and connects to its existing neighbor with a central courtyard.
The building is designed with balconies and work-from-home space in response to COVID, with a rooftop sky lounge offering views to the Art Museum and Center City.
The project originally had 192 residential units at Civic Design Review, with permits issued in 2021.
News items are compiled automatically and may be approximate — verify before relying on them.
Progress

How this project is moving

Life-safety systems ⚠ Status unclear — no recent activity
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.