Market Insights  /  Graduate Hospital & Point Breeze
Development Watch · Graduate Hospital & Point Breeze

1348 S 32nd StUnder construction

49-unit residential new construction, zoned CMX3.

Rendering of 1348 S 32nd St — Permits Issued for 49-Unit Mixed-Use Building at 1348 South 32nd Street in Grays Ferry, South Philadelphia
Permits Issued for 49-Unit Mixed-Use Building at 1348 South 32nd Street in Grays Ferry, South Philadelphia
Published rendering · via phillyyimby.com. Shown for informational purposes; rights belong to the original creator.See the source →

A seven-story, 49-unit apartment building is under construction at 1348 S 32nd St, straddling the Graduate Hospital and Point Breeze boundary. The project, cleared to build in September 2025, will include ground-floor commercial space beneath the residential stack, rising on an 8,741-square-foot lot zoned CMX3. Recent amendments have involved changes to special inspection agencies, partition layouts, and truss submittals—standard mid-construction adjustments as the structure takes shape.

Hero House Holdings LP has held the site since 2015, sitting on what was likely an underused parcel for a decade before moving forward. The by-right CMX3 zoning accommodates this scale without requiring variances, reflecting the city's intent to encourage denser mixed-use development along corridors connecting these two neighborhoods. The commercial component, while not yet leased or detailed, positions the building as more than just a residential infill play—it's a minor anchor in an area that's seen scattered but persistent development.

The surrounding wave has been modest but steady. Within a half mile, only about 20 units have recently delivered or are in progress, including an 11-unit project at 3615 Sears St and a 9-unit development at 2732 Manton St. This isn't a construction frenzy, but it's a measured uptick that suggests developers see opportunity without overwhelming risk. Hero House's 49 units will be the largest piece in this immediate cluster, setting a new ceiling for what's feasible on mid-sized lots in the zone.

The project underscores how even parcels held for years can eventually pencil out when zoning, market timing, and ownership patience align. With CMX3 covering plenty of underbuilt corners in the area, this one offers a template—though the long hold and multi-year construction cycle also hint at the friction still involved in getting mid-rise wood-frame residential off the ground in Philadelphia.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~7-story by-right envelope, not the developer's design.
Units
49
Zoning
CMX3
By-right envelope
~7 stories
Lot
8,741 sq ft
Last sale
$81K · 2015
Cleared to build
Sep 3, 2025
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 82 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~82buildable units
████████ Street
RM1 · 0.15 mi away
Max bid to a builder $4.7M · Opportunity Score 98
Unlock →
~29buildable units
████████ Street
RM1 · 0.17 mi away
Max bid to a builder $425K · Opportunity Score 77
Unlock →
~41buildable units
████████ Street
CMX2 · 0.20 mi away
Max bid to a builder $2.3M · Opportunity Score 77
Unlock →
~42buildable units
████████ Street
ICMX · 0.13 mi away
Max bid to a builder $2.4M · Opportunity Score 71
Unlock →
~37buildable units
████████ Street
ICMX · 0.12 mi away
Max bid to a builder $2.0M · Opportunity Score 68
Unlock →
Unlock the 82 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

11u3615 Sears St0.30 mi
9u2732 Manton St0.42 mi
In the news

What we're hearing about this project

Building permits were issued in September 2025 for a seven-story, 49-unit mixed-use building with ground-floor commercial space and structured parking, budgeted at $8.095 million, designed by Corner Stone Consulting Engi
News items are compiled automatically and may be approximate — verify before relying on them.
Progress

How this project is moving

Interior systems ~64% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.