20-unit residential new construction, zoned CMX4.
A five-story, 20-unit apartment building has been delivered at 689-95 N Broad Street, adding another multi-family project to Northern Liberties' continued stretch north along the corridor. The development includes ground-floor commercial space configured for assembly use, a rooftop deck accessible by elevator and stairs, and just three parking spots—two dedicated to car-share and one accessible space in a private garage reserved for tenants. Broad & Ridge Qoz LLC, the owner of record since 2022, cleared the 3,465-square-foot lot for construction that same year under CMX4 zoning, which allows the five-story by-right envelope without variance haggling.
The building's minimal parking footprint and mixed-use ground floor reflect the growing developer appetite for walkable, transit-oriented infill along this stretch of Broad. With the Broad Street Line a short walk away and Ridge Avenue funneling traffic into Fairmount and the Art Museum area, the location has drawn steady attention from builders betting on spillover demand from more saturated pockets to the south. The inclusion of car-share spots rather than private parking aligns with the neighborhood's evolving mobility profile, though the single accessible space underscores the trade-offs inherent in squeezing density onto a relatively tight lot.
This project lands amid a wider Northern Liberties development wave that has pushed more than 330 units onto nearby parcels within a half-mile radius, including a 119-unit building at 619-29 N Broad and a 70-unit project at 915-23 N Broad. The cluster suggests that mid-rise, by-right multifamily is now the default play for assembled lots in the area, particularly those straddling the CMX4 zone. For investors eyeing underused parcels along Broad north of Spring Garden, the calculus is straightforward: shallow lots can still pencil at five stories if you're willing to work with tight unit counts and limited parking, especially when Opportunity Zone incentives sweeten the pro forma.
The fact that this building delivered with layout modifications and mechanical adjustments as recently as April 2025 hints at the usual construction-phase pivots, but the core program held. As more projects like this fill in the gaps between Spring Garden and Girard, the question for the corridor shifts from whether infill pencils to what mix of ground-floor uses actually activate the street—and whether assembly space proves more durable than the typical nail salon placeholder.
📄 View the project's plan drawings (PDF)As this density arrives, InvestPHL is tracking 146 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.
Unlock the 146 nearby opportunities →Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.