Market Insights  /  University City & Powelton
Development Watch · University City & Powelton

862 N 41st StDelivered

16-unit residential new construction, zoned RM1.

A 16-unit residential building is set to rise at 862 N 41st St in University City & Powelton, the kind of by-right infill quietly reshaping the block. It was cleared to build in Dec 27, 2021.

The 10,349 sq ft site is zoned RM1, which supports a building on the order of 3 stories by right. The parcel last changed hands in 2024. The plans call for for the erection of an attached, three story, "l-shape" structure, of type va construction with a cellar and a roof deck with a roof access structure as per plans. for sixteen (16) dwelling units with layout as shown. amendment (3/6/2023) to change the slope of ramp as per revised plans.

The owner of record is 41brown LLC. The project's plan drawings are on file — worth a look for anyone underwriting the surrounding block.

It isn't rising in isolation. Within a half-mile, 12 other major projects have broken ground since 2022 — roughly 152 units of new supply — including the 10-unit project at 4129 Ogden St, the 9-unit project at 871 N Preston St, the 9-unit project at 871 N Preston St. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~3-story by-right envelope, not the developer's design.
Units
16
Zoning
RM1
By-right envelope
~3 stories
Lot
10,349 sq ft
Last sale
2024
Cleared to build
Dec 27, 2021
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 111 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~106buildable units
████████ Street
RM1 · 0.39 mi away
Max bid to a builder $1.4M · Opportunity Score 95
Unlock →
~61buildable units
████████ Street
RM1 · 0.49 mi away
Max bid to a builder $1.1M · Opportunity Score 90
Unlock →
~38buildable units
████████ Street
RM1 · 0.49 mi away
Max bid to a builder $600K · Opportunity Score 83
Unlock →
~47buildable units
████████ Street
CMX2 · 0.42 mi away
Max bid to a builder $689K · Opportunity Score 80
Unlock →
~47buildable units
████████ Street
CMX2 · 0.43 mi away
Max bid to a builder $783K · Opportunity Score 80
Unlock →
Unlock the 111 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

10u4129 Ogden St0.07 mi
9u871 N Preston St0.10 mi
9u871 N Preston St0.10 mi
9u865 N 40th St0.16 mi
12u748 N 40th St0.22 mi
10u893 Belmont Ave0.27 mi
31u4324 Lancaster Ave0.27 mi
9u4408 Lancaster Ave0.30 mi
Progress

How this project is moving

Cleared for occupancy ~100% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.