8327 Ridge AveDelivered

36-unit residential new construction, zoned CMX2.

Rendering of 8327 Ridge Ave — Permits Issued for Units at 8327 Ridge Avenue in Philadelphia
Permits Issued for Units at 8327 Ridge Avenue in Philadelphia
Rendering of 8327 Ridge Ave — New Construction Retail Space - Equity CRE
New Construction Retail Space - Equity CRE
Published renderings · via phillyyimby.com. Shown for informational purposes; rights belong to the original creator.See the source →

A new four-story, 36-unit residential building has been delivered at 8327 Ridge Avenue in Roxborough, built by-right under CMX2 zoning on a 15,707-square-foot lot. The project includes ground-floor commercial shell space that will need separate fit-out work before occupancy, plus 17 parking spaces and a green roof. The building is Type V-A construction, fully sprinklered, with standpipes running through the stairwells—standard fire-safety infrastructure for a wood-frame mid-rise of this scale.

8327 Ridge LLC acquired the site in 2024 and moved quickly to construction, which was cleared to proceed in March of that year. A summer amendment shifted the location of the electrical and bike-storage rooms on the first floor, a common tweak during the build-out phase. The CMX2 overlay here allows residential above commercial without needing variances, and the developer used the full envelope available—four stories, moderate density, and a parking ratio that works out to roughly one space for every two units.

What stands out is the isolation: there are no significant nearby projects and effectively zero comparable new units within half a mile. Ridge Avenue through this stretch of Roxborough hasn't seen the kind of multi-family momentum that's reshaped corridors closer to the city core, making this a rare test case for whether the market can absorb new apartments this far up the hill. The building's mix of residential and raw commercial space hedges that bet, though leasing the retail will depend heavily on local foot traffic and whether this becomes an anchor or an outlier.

If the project pencils and fills steadily, it could give other landowners along Ridge Avenue a template for mid-density infill on underused commercial lots. For now, it's a singular data point in a neighborhood that hasn't yet decided whether it wants more of this kind of thing.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~4-story by-right envelope, not the developer's design.
Units
36
Zoning
CMX2
By-right envelope
~4 stories
Lot
15,707 sq ft
Last sale
2024
Cleared to build
Mar 12, 2024
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 5 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~20buildable units
████████ Street
RM2 · 0.31 mi away
Max bid to a builder $171K · Opportunity Score 90
Unlock →
~44buildable units
████████ Street
CMX2 · 0.29 mi away
Max bid to a builder $610K · Opportunity Score 78
Unlock →
~8buildable units
████████ Street
RM2 · 0.29 mi away
Max bid to a builder $44K · Opportunity Score 72
Unlock →
~3buildable units
████████ Street
RM2 · 0.32 mi away
Max bid to a builder $22K · Opportunity Score 45
Unlock →
~3buildable units
████████ Street
RM2 · 0.32 mi away
Max bid to a builder $41K · Opportunity Score 44
Unlock →
Unlock the 5 nearby opportunities →
In the news

What we're hearing about this project

Permits were issued in March 2024 for the four-story, 36-unit residential project designed by Ingram/Sageser Architecture & Planning with a $3 million construction cost.
The completed building now operates as The Mezzo apartments, leasing units starting from $1,525-$2,140 per month.
The ground floor features 2,400 square feet of retail space beneath 36 residential units at The Mezzo Apartments.
The apartment community was built in 2025 and has 36 units across 3 stories.
News items are compiled automatically and may be approximate — verify before relying on them.
Progress

How this project is moving

Cleared for occupancy ~100% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.