Market Insights  /  Old City & Society Hill
Development Watch · Old City & Society Hill

502 Wood StUnder construction

74-unit residential new construction, zoned CMX3.

Rendering of 502 Wood St — Construction Not Yet Started at 502 Wood Street in Old City
Construction Not Yet Started at 502 Wood Street in Old City
Rendering of 502 Wood St — A New Design and 74 Units Coming to 5th & Wood in Old City
A New Design and 74 Units Coming to 5th & Wood in Old City
Published renderings · via phillyyimby.com. Shown for informational purposes; rights belong to the original creator.See the source →

A 74-unit residential building is under way at 502 Wood Street, delivering six stories across an 11,493-square-foot lot where Old City meets Society Hill. The project stacks type III-B wood-frame construction above a concrete podium—basement and first floor built to type I-A standards—and includes a rooftop deck, penthouse structures, and ground-floor parking. The building relies on horizontal fire separation to meet code, with full sprinklers and standpipes throughout.

Wood St Assoc LP took title in 2022 and cleared the site for construction by spring 2024. The CMX3 zoning permits the density by right, a detail that matters in a corridor where most multifamily plays rely on straightforward entitlements rather than variance theatrics. The project joins a cluster of mid-rise deliveries radiating from the northern edge of Old City, including an 85-unit building at 230-36 Vine and a 75-unit project at 416-24 Vine—together adding nearly 300 units within a half-mile radius.

That wave of activity puts pressure on surrounding parcels still holding low-slung warehouse conversions and surface lots, particularly along the Wood Street corridor where CMX3 runs deep and land assemblage remains feasible. The scale here—74 units on a quarter-acre footprint—shows how five- and six-story wood podiums have become the default pencil for infill developers working older industrial blocks. It's efficient, predictable, and increasingly common as investors bet on rental absorption in a neighborhood that still straddles residential and commercial identities.

As construction continues, the building will test whether Old City's residential base can absorb this steady clip of new supply without meaningful retail or street-life infrastructure to match. The neighborhood has added units faster than amenities, and 502 Wood is another datapoint in that imbalance.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~6-story by-right envelope, not the developer's design.
Units
74
Zoning
CMX3
By-right envelope
~6 stories
Lot
11,493 sq ft
Last sale
$4.3M · 2022
Cleared to build
Apr 22, 2024
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 87 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~328buildable units
████████ Street
CMX4 · 0.47 mi away
Max bid to a builder $23M · Opportunity Score 100
Unlock →
~100buildable units
████████ Street
IRMX · 0.40 mi away
Max bid to a builder $7.0M · Opportunity Score 100
Unlock →
~57buildable units
████████ Street
IRMX · 0.46 mi away
Max bid to a builder $3.9M · Opportunity Score 100
Unlock →
~58buildable units
████████ Street
CMX3 · 0.27 mi away
Max bid to a builder $4.0M · Opportunity Score 100
Unlock →
~208buildable units
████████ Street
CMX3 · 0.35 mi away
Max bid to a builder $14M · Opportunity Score 100
Unlock →
Unlock the 87 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

75u416-24 Vine St0.07 mi
34u322-40 Race St0.22 mi
85u230-36 Vine St0.23 mi
35u208-12 Vine St0.27 mi
11u225 Quarry St0.29 mi
51u217 N 9th St0.32 mi
In the news

What we're hearing about this project

As of August 2024, construction has not started on the revised 74-unit project by TierView Development and CANNOdesign that received provisional approval in December 2023.
November 2023 article details the revised CANNOdesign plans for 74 units with 16 parking spaces, 25 bike spaces, and a roof deck at the six-story building.
February 2023 report noted TierView Development took over as developer with CANNOdesign as architect after JKRP's plans were rejected by the Historical Commission.
News items are compiled automatically and may be approximate — verify before relying on them.
Progress

How this project is moving

Interior systems ~64% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.