Market Insights  /  Elmwood & Eastwick
Development Watch · Elmwood & Eastwick

7101 Woodland AveDelivered

22-unit residential new construction, zoned IRMX.

A four-story, 22-unit mixed-use building has been delivered at 7101 Woodland Avenue in Elmwood, combining residential with ground-floor medical offices and fourth-floor professional space. The project, developed by H&M Care Inc, cleared construction in late 2022 on an 11,000-square-foot lot in an IRMX-zoned corridor that allows for this kind of mid-rise density by right. The building includes a basement-level medical component, two floors of apartments, and top-floor business offices, with a maintenance-access roof structure but no tenant deck—an efficient vertical stack that maximizes return on a relatively compact footprint.

The design evolved considerably during construction. Amendments approved through 2024 revised interior layouts, eliminated a planned pharmacy fit-out in favor of shell space, and adjusted building openings. Earlier changes included additional underpinning and temporary excavation support, suggesting the site presented some geotechnical challenges during development. The building is fully sprinklered and includes standpipe systems, standard for a project of this scale and occupancy mix.

What stands out is the isolation: there are no comparable nearby projects within a half-mile radius, making this a rare speculative bet on Woodland Avenue's mixed-use potential in a stretch that hasn't seen the kind of sustained development activity common to other Southwest Philadelphia corridors. H&M Care Inc, which acquired the site in 2022, is bringing a programmatic mix—medical, residential, office—that hedges against single-use risk in a location still finding its footing as a redevelopment node.

The delivery of this building introduces a new density template to a neighborhood largely defined by single-family rowhouses and smaller commercial strips. Whether it sparks adjacent investment depends on lease-up performance and whether the medical anchor proves sticky enough to justify similar mixed-use plays on surrounding underbuilt parcels. For now, it's a solitary proof of concept.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~4-story by-right envelope, not the developer's design.
Units
22
Zoning
IRMX
By-right envelope
~4 stories
Lot
10,996 sq ft
Last sale
2022
Cleared to build
Nov 30, 2022
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 140 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~336buildable units
████████ Street
ICMX · 0.22 mi away
Max bid to a builder $5.5M · Opportunity Score 98
Unlock →
~170buildable units
████████ Street
CMX2 · 0.40 mi away
Max bid to a builder $2.7M · Opportunity Score 95
Unlock →
~153buildable units
████████ Street
CMX2 · 0.37 mi away
Max bid to a builder $2.4M · Opportunity Score 95
Unlock →
~145buildable units
████████ Street
CMX2 · 0.37 mi away
Max bid to a builder $2.2M · Opportunity Score 95
Unlock →
~194buildable units
████████ Street
ICMX · 0.40 mi away
Max bid to a builder $3.0M · Opportunity Score 95
Unlock →
Unlock the 140 nearby opportunities →
Progress

How this project is moving

Cleared for occupancy ~100% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.