Market Insights  /  Girard Estates & Newbold
Development Watch · Girard Estates & Newbold

1951 Point Breeze AveDelivered

29-unit residential new construction, zoned CMX2.

A 29-unit residential building is set to rise at 1951 Point Breeze Ave in Girard Estates & Newbold, the kind of by-right infill quietly reshaping the block. It was cleared to build in Dec 12, 2019.

The 10,357 sq ft site is zoned CMX2, which supports a building on the order of 4 stories by right. Records show the parcel last traded in 2019 for $500K. The plans call for for the erection of a detached structure with vacant commercial space on the groud floor- and multi family living above (29) units floor 2-4. (13) accessory parking spots with one van accessible and (9) bike spaces. structure to also feature a roof deck accessible by a pilot house and balconies on floors 2-4--size and location as shown on attached plans.

The owner of record is Ira Development LLC.

It isn't rising in isolation. Within a half-mile, 1 other major projects have broken ground since 2022 — roughly 20 units of new supply — including the 20-unit project at 2901 Snyder Ave. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

Schematic massing — illustrative of the ~4-story by-right envelope, not the developer's design.
Units
29
Zoning
CMX2
By-right envelope
~4 stories
Lot
10,357 sq ft
Last sale
$500K · 2019
Cleared to build
Dec 12, 2019
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 99 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~94buildable units
████████ Street
RM1 · 0.38 mi away
Max bid to a builder $1.5M · Opportunity Score 94
Unlock →
~97buildable units
████████ Street
CMX2 · 0.18 mi away
Max bid to a builder $1.4M · Opportunity Score 91
Unlock →
~69buildable units
████████ Street
CMX2 · 0.38 mi away
Max bid to a builder $1.0M · Opportunity Score 87
Unlock →
~85buildable units
████████ Street
ICMX · 0.44 mi away
Max bid to a builder $1.4M · Opportunity Score 86
Unlock →
~40buildable units
████████ Street
RM1 · 0.33 mi away
Max bid to a builder $409K · Opportunity Score 84
Unlock →
Unlock the 99 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

20u2901 Snyder Ave0.49 mi
Progress

How this project is moving

Cleared for occupancy ⚠ Status unclear — no recent activity
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.