Market Insights  /  Fairhill
Development Watch · Fairhill

2325 N Front StDelivered

63-unit residential new construction, zoned CMX2.5.

Filed plan drawing for 2325 N Front St
From the project's plan drawings — schematic and subject to revision; not a marketing rendering.View the full plan set (PDF) →

A 63-unit residential building is set to rise at 2325 N Front St in Fairhill, a mid-scale addition to one of the city's busier development corridors. It was cleared to build in Jan 22, 2021.

The 14,991 sq ft site is zoned CMX2.5, which supports a building on the order of 5 stories by right. The parcel last changed hands in 2020. The plans call for for the erection of five (5) story attached mixed-use structures with a roof deck and roof deck access structures to be used as a total of sixty three [63] dwelling units (two of which are ada 'type a' accessible) and two [2] commercial units [usre registration required prior to occupancy] with twenty-two (22) bicycle spaces on an accessible route, as per plans; standby power will be provided for accessible means of egress. separate permits required for all mep/fsp work; building to be fully sprinklered as per nfpa 13 w/standpipes w/in interior exit stairways as per nfpa 14; pedestrian protection as per 2018 ibc ch33 and l&i code bulletin b-0503-r2. all work to be done per approved plans and in accordance with 2018 ibc. **underpinning is included in scope of work** amended as of 6.16.2021: revisions to basement, foundations and shoring plans; removal of horizontal exit, emergency backup power for elevators provided; relocaiton of type a dwelling unit. .

The owner of record is Acg 2315 Front LLC. The project's plan drawings are on file — worth a look for anyone underwriting the surrounding block.

It isn't rising in isolation. Within a half-mile, 12 other major projects have broken ground since 2022 — roughly 392 units of new supply — including the 60-unit project at 2221 N Front St, the 14-unit project at 2214 N Front St, the 108-unit project at 2000-20 E Hagert St. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~5-story by-right envelope, not the developer's design.
Units
63
Zoning
CMX2.5
By-right envelope
~5 stories
Lot
14,991 sq ft
Last sale
2020
Cleared to build
Jan 22, 2021
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 125 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~131buildable units
████████ Street
ICMX · 0.47 mi away
Max bid to a builder $5.6M · Opportunity Score 99
Unlock →
~259buildable units
████████ Street
ICMX · 0.48 mi away
Max bid to a builder $11M · Opportunity Score 99
Unlock →
~240buildable units
████████ Street
ICMX · 0.45 mi away
Max bid to a builder $10M · Opportunity Score 99
Unlock →
~69buildable units
████████ Street
CMX3 · 0.16 mi away
Max bid to a builder $2.9M · Opportunity Score 98
Unlock →
~239buildable units
████████ Street
CMX2.5 · 0.35 mi away
Max bid to a builder $4.6M · Opportunity Score 98
Unlock →
Unlock the 125 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

60u2221 N Front St0.11 mi
14u2214 N Front St0.12 mi
108u2000-20 E Hagert St0.14 mi
28u2406 Mascher St0.17 mi
18u2520 N Front St0.21 mi
31u2112 N Front St0.24 mi
15u2449 N 2nd St0.27 mi
8u2034 N Front St0.30 mi
Progress

How this project is moving

Cleared for occupancy ~100% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.