Market Insights  /  University City & Powelton
Development Watch · University City & Powelton

3714-22 Chestnut StDelivered

405-unit residential new construction, zoned CMX4.

The Chestnut at University CityDeveloperEQT ExeterArchitectSITIO architecture + urbanismStatusBuilt in 2020, currently leasingOfficial site →
Filed plan drawing for 3714-22 Chestnut St
From the project's plan drawings — schematic and subject to revision; not a marketing rendering.View the full plan set (PDF) →

A 29-story residential tower containing 405 units has been delivered at 3714–22 Chestnut Street in University City, adding another high-rise presence to a corridor that's been steadily thickening over the past half-decade. The building includes a handful of ground-floor commercial shells, underground parking, and amenity decks on the second and 29th floors, rising from a roughly 26,500-square-foot parcel zoned CMX4. The project is owned by Em Chestnut Venture LLC, which acquired the site in 2018 and was cleared to build the following February.

The tower joins a concentrated wave of large-scale residential projects within a half-mile radius, which together have added more than 800 units to the immediate area. Noteworthy neighbors include twin 363-unit projects at 3615 Chestnut and a 95-unit building at 4050 Ludlow, reinforcing University City's shift from low-slung institutional and retail fabric to a denser, more vertical housing market. The development required a zoning variance and City Planning Commission sign-off for public-space adjustments, indicating some negotiation over street-level treatment despite the underlying by-right potential of the CMX4 designation.

What's notable here isn't just the project's size but its timing—construction launched well before the pandemic and delivered into a very different rental environment than the one it was originally conceived for. The presence of three vacant commercial bays at grade suggests the developer is still working out the retail component, a familiar challenge along Chestnut's mid-blocks where foot traffic can be uneven. As more of these towers come online and occupancy settles, the question becomes whether the block's remaining underdeveloped parcels—many still occupied by one- and two-story commercial buildings—will follow suit or wait out the next cycle.

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~29-story by-right envelope, not the developer's design.
Units
405
Zoning
CMX4
By-right envelope
~29 stories
Lot
26,574 sq ft
Last sale
$19M · 2018
Cleared to build
Feb 14, 2019
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 44 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~283buildable units
████████ Street
CMX4 · 0.16 mi away
Max bid to a builder $4.4M · Opportunity Score 97
Unlock →
~283buildable units
████████ Street
CMX4 · 0.16 mi away
Max bid to a builder $4.4M · Opportunity Score 97
Unlock →
~283buildable units
████████ Street
CMX4 · 0.16 mi away
Max bid to a builder $4.6M · Opportunity Score 97
Unlock →
~283buildable units
████████ Street
CMX4 · 0.16 mi away
Max bid to a builder $4.4M · Opportunity Score 97
Unlock →
~194buildable units
████████ Street
RM4 · 0.06 mi away
Max bid to a builder $3.0M · Opportunity Score 96
Unlock →
Unlock the 44 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

363u3615 Chestnut St0.11 mi
363u3615 Chestnut St0.11 mi
95u4050 Ludlow St0.36 mi
In the news

What we're hearing about this project

The project is a partnership between the Archdiocese of Philadelphia and private developer EQT Exeter creating a 30-story mixed-use residential tower.
The 30-story mixed-use residential project integrates 405 luxury apartments with amenity spaces, a sky deck pool, and below grade parking.
News items are compiled automatically and may be approximate — verify before relying on them.
Progress

How this project is moving

Cleared for occupancy ~78% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.