Market Insights  /  Fishtown & East Kensington
Development Watch · Fishtown & East Kensington

122 E Cumberland StUnder construction

4-unit residential new construction, zoned RM1.

A 4-unit residential building is set to rise at 122 E Cumberland St in Fishtown & East Kensington, the kind of by-right infill quietly reshaping the block. It was cleared to build in May 21, 2025.

The 1,667 sq ft site is zoned RM1, which supports a building on the order of 3 stories by right. Records show the parcel last traded in 2024 for $200K. The plans call for new construction of a three (3) story building with basement and private roof deck with pilot house for use as four (4) dwelling units as per approved plans. building to be fully sprinklered. *2018 ibc review* **separate permits required for mep & fire suppression work**.

The owner of record is Cumberland Estates LLC. The project's plan drawings are on file — worth a look for anyone underwriting the surrounding block.

It isn't rising in isolation. Within a half-mile, 12 other major projects have broken ground since 2022 — roughly 461 units of new supply — including the 18-unit project at 2520 N Front St, the 28-unit project at 2406 Mascher St, the 108-unit project at 2000-20 E Hagert St. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~3-story by-right envelope, not the developer's design.
Units
4
Zoning
RM1
By-right envelope
~3 stories
Lot
1,667 sq ft
Last sale
$200K · 2024
Cleared to build
May 21, 2025
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 116 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~131buildable units
████████ Street
ICMX · 0.35 mi away
Max bid to a builder $5.6M · Opportunity Score 99
Unlock →
~259buildable units
████████ Street
ICMX · 0.38 mi away
Max bid to a builder $11M · Opportunity Score 99
Unlock →
~240buildable units
████████ Street
ICMX · 0.30 mi away
Max bid to a builder $10M · Opportunity Score 99
Unlock →
~69buildable units
████████ Street
CMX3 · 0.06 mi away
Max bid to a builder $2.9M · Opportunity Score 98
Unlock →
~225buildable units
████████ Street
CMX2 · 0.41 mi away
Max bid to a builder $3.7M · Opportunity Score 97
Unlock →
Unlock the 116 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

18u2520 N Front St0.07 mi
28u2406 Mascher St0.18 mi
108u2000-20 E Hagert St0.22 mi
15u2449 N 2nd St0.25 mi
60u2221 N Front St0.26 mi
14u2214 N Front St0.28 mi
16u2456 Frankford Ave0.38 mi
31u2112 N Front St0.39 mi
Progress

How this project is moving

Life-safety systems ~78% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.