Market Insights  /  Graduate Hospital & Point Breeze
Development Watch · Graduate Hospital & Point Breeze

1941 Christian StDelivered

9-unit residential new construction, zoned RM1.

A 9-unit residential building is set to rise at 1941 Christian St in Graduate Hospital & Point Breeze, the kind of by-right infill quietly reshaping the block. It was cleared to build in Nov 3, 2020.

The 786 sq ft site is zoned RM1, which supports a building on the order of 4 stories by right. The plans call for for the erection of an attached structure with cellar and an accessory roof deck (for residential use only) with roof access structure. (low income bonus applied for an additional 7ft height to this permit (14+702(7)(b)(.6) and (c)). for use as a single family household living as per approved plans. building to be fully sprinklered. separate permits required for m.e.p.s work. amendment to layout, facade design, column lines dismentions as per approved revised plans.

The owner of record is Raymond Xi.

It isn't rising in isolation. Within a half-mile, 2 other major projects have broken ground since 2022 — roughly 25 units of new supply — including the 9-unit project at 757 S 15th St, the 16-unit project at 1111 S 24th St. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

Schematic massing — illustrative of the ~4-story by-right envelope, not the developer's design.
Units
9
Zoning
RM1
By-right envelope
~4 stories
Lot
786 sq ft
Cleared to build
Nov 3, 2020
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 95 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~57buildable units
████████ Street
CMX3 · 0.48 mi away
Max bid to a builder $3.4M · Opportunity Score 99
Unlock →
~89buildable units
████████ Street
CMX3 · 0.32 mi away
Max bid to a builder $5.2M · Opportunity Score 99
Unlock →
~59buildable units
████████ Street
CMX3 · 0.48 mi away
Max bid to a builder $3.3M · Opportunity Score 99
Unlock →
~74buildable units
████████ Street
CMX3 · 0.47 mi away
Max bid to a builder $4.1M · Opportunity Score 99
Unlock →
~78buildable units
████████ Street
RM1 · 0.24 mi away
Max bid to a builder $4.5M · Opportunity Score 98
Unlock →
Unlock the 95 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

9u757 S 15th St0.43 mi
16u1111 S 24th St0.43 mi
Progress

How this project is moving

Cleared for occupancy ~100% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.