Market Insights  /  University City & Powelton
Development Watch · University City & Powelton

4226 Otter StCleared to build

4-unit residential new construction, zoned RM1.

A 4-unit residential building is set to rise at 4226 Otter St in University City & Powelton, the kind of by-right infill quietly reshaping the block. It was cleared to build in Sep 18, 2026.

The 1,588 sq ft site is zoned RM1, which supports a building on the order of 3 stories by right. Records show the parcel last traded in 2025 for $170K. The plans call for new construction of a three-story building with basement and private roof deck/pilot house for use as four (4) dwelling units as per approved plans. work to include underpinning to be monitored by a pa licensed pe at all times. building to be fully sprinklered. *2018 ibc review* **separate permits required for mep & fire suppression work**.

The owner of record is 4 Castle LLC. The project's plan drawings are on file — worth a look for anyone underwriting the surrounding block.

It isn't rising in isolation. Within a half-mile, 12 other major projects have broken ground since 2022 — roughly 212 units of new supply — including the 10-unit project at 893 Belmont Ave, the 10-unit project at 4129 Ogden St, the 9-unit project at 4408 Lancaster Ave. That kind of concentration is exactly what pulls land values, and buyer attention, toward a block.

We'll update this page as the project progresses — leasing, retail tenants, renderings, and construction milestones as they surface. The relevant question for investors and agents: what are the surrounding parcels worth to a builder now that this is coming?

📄 View the project's plan drawings (PDF)
Schematic massing — illustrative of the ~3-story by-right envelope, not the developer's design.
Units
4
Zoning
RM1
By-right envelope
~3 stories
Lot
1,588 sq ft
Last sale
$170K · 2025
Cleared to build
Sep 18, 2026
For developers & investors

Underpriced parcels near this project

As this density arrives, InvestPHL is tracking 103 under-built parcels within a half-mile that a developer could still acquire and build — each carrying a builder's max bid. Addresses and figures are members-only.

~208buildable units
████████ Street
CMX2 · 0.46 mi away
Max bid to a builder $3.3M · Opportunity Score 97
Unlock →
~61buildable units
████████ Street
RM1 · 0.31 mi away
Max bid to a builder $1.1M · Opportunity Score 90
Unlock →
~79buildable units
████████ Street
CMX2 · 0.33 mi away
Max bid to a builder $1.2M · Opportunity Score 89
Unlock →
~62buildable units
████████ Street
CMX2 · 0.41 mi away
Max bid to a builder $967K · Opportunity Score 85
Unlock →
~47buildable units
████████ Street
CMX2 · 0.23 mi away
Max bid to a builder $689K · Opportunity Score 80
Unlock →
Unlock the 103 nearby opportunities →
The block

What else is rising nearby

Major (8+ unit) new-construction projects filed within a half-mile since 2022 — the density gathering around this site.

10u893 Belmont Ave0.13 mi
10u4129 Ogden St0.15 mi
9u4408 Lancaster Ave0.19 mi
31u4324 Lancaster Ave0.20 mi
8u1221 N 42nd St0.24 mi
9u871 N Preston St0.28 mi
9u871 N Preston St0.28 mi
8u1203 N 41st St0.30 mi
Progress

How this project is moving

In permitting ~18% complete
Estimated from the construction permit sequence — an approximation of stage, not a precise schedule.
Every logged milestone appears here — highlighted ones are the headline stages; the rest track interim construction activity. Checked daily.
Compiled by InvestPHL. Unit counts, scope, and ownership are as recorded and subject to revision; the massing figure is a schematic illustration of the by-right envelope, not the developer's design or a marketing rendering. Verify zoning, status, and title with counsel before acting. InvestPHL does not list, market, or represent any property, buyer, or seller.